1·This paper presents the development of a visual configuration system used for a full CRT fossil power plant training simulator, which utilizes advanced distributed control system(DCS).
介绍了最新研制的基于分布式控制系统(DCS)的火电站全CRT仿真培训装置中热力系统控制回路的可视化组态软件系统。
2·Now this is the simplest type of nuclear power plant and exactly replicates what is done in a fossil plant.
现在,这是核能电站最简单的类型,那也重复了在化石电站里会做的事情。
3·Half of those emissions are caused by the time it takes to plan and build a nuclear power plant - time during which fossil fuels have to be burnt for energy.
其中一半的排放来自于核电站的规划和建造阶段,这个阶段它不得不依赖化石能源。
4·It would be the first new fossil-fuel burning power plant in Scotland for 30 years - a real step backwards for the country that has pioneered wind power in Britain.
这可能是三十年来苏格兰第一座燃烧矿物燃料的新电厂——对这个曾经在不列颠开创了风力发电的国家来说,这是真正倒退的一步。
5·With the reform of power system, fossil-fired power plants are increasingly concerned about the optimization of plant operation so as to enhance their competitiveness.
随着电力体制改革的进一步深化,如何更好地优化机组运行,提高电厂的竞争能力成为火电厂关心的重要问题。
6·Working principle and system function of BLD type boiler leakage monitor system on line, and its effectiveness applied to fossil-fired power plant were discussed.
阐述了BLD型锅炉泄漏在线监测系统的工作原理、系统功能,以及在火力发电厂中的应用效果。
7·Leakage of "Four Tube" in boiler is always the major hidden peril for safety operation of fossil-fired power plant.
锅炉“四管”泄漏一直是影响火电厂安全生产、稳定运行的一大忧患。
8·This conception is helpful to advance the level of economical operation of high pressure heater system in fossil-fueled power plant.
对提高火电厂大机组高加系统经济运行水平具有一定的指导意义。
9·Scaling of ash sluicing pipes is a problem widely existing in hydraulic ash sluicing pipes of fossil-fired power plant, chemical method or physical method is usually used as antiscaling measure.
火电厂水力输灰管道普遍存在发管结垢问题,通常采用化学方法或物理方法的防垢措施。